How to Read Architectural Working Drawings as a Homeowner
Working drawings guide the budget, the contract, and the builders on site. Learn how to read them and what to check before you sign off.

Architectural working drawings are the technical documents your house is built from. They set out the dimensions, materials, and details used to price the work, sign the contract, and guide the builders on site. You don't need to read them like an architect. You do need to understand them well enough to confirm they reflect what you actually need.
What working drawings are and why they matter
Drawings develop in stages. Early concept sketches and 3D visuals help you picture how the spaces will feel. Working drawings are the next step: every design decision becomes information that can actually be built.
They are also the basis for the RAB (the Indonesian construction budget) and the BOQ (bill of quantities, which lists the quantity of each work item). If the drawings are incomplete, quantities can be wrong and decisions end up being made on site. That is often where extra costs and mid-project disputes begin.
What a set of working drawings contains
For a house, a working drawing set usually includes:
- Floor plans: a top-down view of each level showing rooms, walls, doors, windows, and dimensions.
- Elevations: each side of the building, with materials and heights.
- Sections: vertical cuts through the building showing floor heights, ceilings, stairs, and the roof.
- Roof, ceiling, and floor pattern plans: roof pitch, ceiling types, light positions, and floor finish layout.
- Details: larger-scale drawings of stairs, bathrooms, frames, railings, and material junctions.
- Door and window schedules: tables listing the type, size, material, and hardware for each opening.
- Structural and MEP drawings: foundations, columns, and beams, plus mechanical, electrical, and plumbing. These are usually prepared with the relevant engineers and must be coordinated with the architectural set.
The basics: scale, dimensions, and symbols
Scale and dimensions
Every sheet states its scale, for example 1:100 for plans and 1:20 for details. Dimensions are usually in millimetres or centimetres, so check the units in the legend. Also check whether a dimension runs to the wall centreline or to the finished surface. A few centimetres can decide whether a wardrobe or a bed fits.
Levels
The ±0.00 mark is the reference height, usually the ground floor. Figures such as +0.15 or -0.05 show floors that sit above or below that reference. From these you can read the level changes at the terrace, carport, and bathrooms, and where the house sits relative to the street.
Grids, callouts, and legends
Lettered and numbered grid lines help you find the same position across different sheets. Numbered circles (callouts) show that an area has a detail drawing on another sheet. Symbols for sockets, lights, and switches are explained in the legend, so read the legend before you review each room.
What to check as an owner
You don't need to check structural calculations. Focus on what affects daily life most:
- Room sizes against furniture. Picture where the sofa, dining table, and wardrobes go. Make sure there is still room to walk around them.
- Door and window swings. Check that doors don't hit furniture or clash with each other in narrow corridors.
- Power and water points. Match socket positions to desks, TVs, and kitchen appliances. Check taps, water heaters, and air-conditioning points as well.
- Ceiling heights and level changes. Use the sections to confirm the rooms will feel comfortable and that wet areas have planned level drops.
- Material specifications. Make sure the drawings name the materials you agreed on, not just an open-ended "or equivalent".
If something is unclear, write it down and raise it in writing. A question at drawing stage costs far less than demolition on site.
How drawings connect to the budget and contract
The working drawings and the budget should mirror each other. Every item in the drawings should appear in the BOQ, and the reverse should also hold. For a full guide, see how to read a construction budget.
Once the drawings are approved, there is usually a design freeze: an agreement that the design will not change without a set procedure. Changes after that point are handled as variation orders, meaning changes to the work that are costed, scheduled, and approved before they are carried out. Read more in our article on variation orders and how to control them.
Make a habit of checking the revision box on each sheet as well. Revision numbers and dates make sure everyone is working from the same version.
How we manage working drawings
At Brun Vert Studio, working drawings are developed in phase 03, Technical Development. This comes after design and cost estimates have been aligned in Design & Cost Alignment. Architectural, structural, and MEP drawings are coordinated so they don't contradict each other. The RAB and BOQ are then prepared from those drawings before the contract is signed.
Each phase ends with an approval point, so you approve the drawings knowingly rather than simply receiving files. The full sequence is set out on our process page. You can see what drawing work covers under our architectural design service.
Frequently asked questions
Are working drawings the same as permit drawings?
Not entirely. Documents for the PBG (Indonesia's building approval) have their own requirements and format, although much of the information comes from the same drawings. Our article on when to start the building permit explains the timing.
How long do working drawings take?
It depends on the size of the building, the complexity of the design, and how quickly decisions are made at each approval point. A realistic timeline is discussed from the initial project review.
Can drawings change after approval?
Yes, through a documented change procedure. You should know and approve the cost and time impact before the work goes ahead.
If you are planning a new home or a renovation and want working drawings coordinated with the budget from the start, you can request an initial project review. We will look at your needs and site conditions before recommending next steps.