Cost Estimator
What might your home cost to build?
Enter the building area and choose a specification level. The result is a rough range to help you weigh your budget early — not a price quotation.
About this figure
- An early indication, not a quotation. Final figures are set in the bill of quantities after the survey, design and scope definition.
- Reference rates follow the per-m² prices we currently use and may be updated. Figures exclude land purchase, permits, taxes and design fees.
- A major renovation often costs more per m² than a new home because of demolition, strengthening and the condition of the existing building.
- Results are stored without personal data to help us understand what visitors need.
Start here · BV Pre-Build Diagnostic
Before Drawing Anything, Make Sure the Project Makes Sense.
Many people start with a house style. BV starts with the site, the people, the space needs, the budget, the risks and the early decisions.
What gets mapped
- Site Snapshot
- Life Profile
- Space Requirement
- Budget Reality
- Early Risk
- Initial Design Direction
- Decision Map
IDR 1,000,000 · Get a clear picture of the site, needs, budget, risks and design direction before making bigger decisions.
