First Architect Consultation: Inside the Discovery Session
A first architect consultation is not a sketching session. Here is what a discovery session covers, what to prepare, and what you should reasonably receive afterwards.

Your first architect consultation is not the moment to see a finished design or receive a fixed price. Its purpose is to understand your needs, site, budget, and constraints clearly enough that the next steps can be planned in a measured way. At Brun Vert Studio, we call this stage Project Discovery.
Why the first session sets the direction
Many project problems start with a vague brief. Room requirements that were never agreed, a budget that was never discussed openly, or zoning rules that were never checked can all force a design to be redone. Redesign costs both time and money.
A discovery session aligns understanding from the start. The architect is not judging your taste. They are gathering the information needed to produce a design that is buildable, compliant, and within your budget.
What to prepare
You do not need a finished concept. But a few pieces of information make the conversation far more productive:
- Site information: address, dimensions, shape, a copy of the land title if available, and photos of the surroundings and road access.
- Space requirements: number of occupants and bedrooms, daily routines, vehicles, home office needs, and long-term plans.
- Budget range: a realistic figure, and whether it includes interiors, landscaping, and permits.
- Timeline: when you want to start and when you need the building.
- References: photos or projects you like, and why you like them.
- For renovations: any existing drawings, notes on issues such as leaks or cracks, and past repair history.
If you are planning a renovation, 7 Things to Prepare Before Renovating can help you build this list.
What a discovery session covers
Needs and lifestyle
Expect questions that go beyond bedroom count. Who cooks, how often you host guests, whether an older family member needs step-free access, and which spaces get used most. These answers shape zoning and how rooms relate to each other.
Site conditions and regulations
Plot size is not the same as buildable area. Local rules such as KDB (building coverage ratio), KLB (floor area ratio), and GSB (building setback line) limit the footprint and height. We explain these in KDB, KLB, and GSB Before Designing a Home. The need for a PBG (Indonesia's building approval) can also be raised here, although handling the application is a separate scope.
Budget and priorities
This part can feel awkward, but it matters most. The architect needs your budget range to judge whether the floor area, number of storeys, and finish level you expect are in balance. If they are not, priorities need to be set: what is essential, and what can be deferred or simplified.
Schedule and decision-making
Who gives final approval, how quickly decisions can be made, and whether there is a fixed deadline. These practical points affect the design schedule as much as any technical factor.
What cannot be answered yet
Some questions are reasonable to ask but cannot be answered responsibly at this stage:
- A fixed cost. Only an early range is possible. A more accurate figure comes from the RAB (cost plan) and BOQ (bill of quantities) once the design develops.
- A final design. Early sketches may help clarify direction, but a final design requires data and staged approvals.
- Hidden conditions. In renovations, the state of structure and services behind walls is often only known after a survey or limited opening-up.
An architect who quotes a firm number without site data and a clear scope deserves a second look. How design and budget are linked early on is covered in Designing a Home That Fits the Budget Early.
Reasonable outputs after discovery
A good discovery does not end with a general impression. It produces documents you can reread and approve. Typically:
- A brief summary: agreed space needs, priorities, and constraints.
- A list of assumptions: items still to be verified, such as soil data or local regulations.
- A proposed scope: the relevant service, for example architectural design only, or full design and build.
- Next steps and their approval points.
At Brun Vert Studio, Project Discovery is the first of four phases, followed by Design & Cost Alignment, Technical Development, and Construction & Handover. Each phase ends with an approval point. You can see the full flow on our process page.
Signs the session is going well
- The architect asks and listens more than they present.
- Budget is discussed openly, including the risks if expectations are not yet balanced.
- Technical terms are explained in plain language.
- There is a written record of what was agreed and what remains open.
- Next steps are clear: what will be done, by whom, and what you need to decide.
When the follow-up proposal arrives, How to Read an Architect's Proposal helps you assess scope and deliverables objectively.
Frequently asked questions
How long does a discovery session take?
It depends on project complexity. A new home on an empty plot is usually simpler than a full renovation that requires a survey of existing conditions. Discovery may be a single meeting or several meetings plus a site visit.
Do I need to own the land already?
Not necessarily. Discovery is also useful for comparing candidate plots, since size, orientation, and local rules strongly affect both design and cost.
Can I get a cost indication after the first session?
You can receive an early range based on assumptions stated in writing. For general reference, see our pricing page. A more detailed estimate is developed alongside the design and set out in the RAB/BOQ before contract.
If you are planning a new home, renovation, or commercial space in Greater Jakarta, the most useful first step is to organise your information and needs. You can request an initial project review, and we will review that information before agreeing the next steps with you.