Design & build process
How BV Works
Six stages, from understanding the site and the people who will live there to learning from the home once it is lived in. The principle is simple: settle it before you build it.
Six stages
What happens, what you receive, and the tools behind it.
-
01
Understand
Understanding the site, the people and the limits
What happens
Site survey, a profile of the people who will live there and their routines, space needs, budget range, and early risks such as ground and existing-building conditions, local rules and site access.
What you receive & decide
You get an honest picture of the site, needs and budget — then decide whether, and how, to go ahead.
BV documents & tools
- BV Pre-Build Diagnostic Report (PDF)In use
- Online project-fit checkIn use
-
02
Decide
Settling what matters most, first
What happens
Priorities and major decisions are mapped and put in order. Scope, fees, schedule and payment terms are written down before work begins.
What you receive & decide
You approve the scope and receive a written quotation and work order. Each document can be checked as genuine through its QR code.
BV documents & tools
- Quotation & work order with payment stagesIn use
- QR document verificationIn use
- Decision RecordBeing built
-
03
Design
Designing with reasons and a cost boundary
What happens
Concept, design development and technical documents are developed alongside the cost estimate. Each milestone ends with an approval before moving on.
What you receive & decide
At every milestone you receive our recommendation with its reasoning, and you approve the design before construction.
BV documents & tools
- Design milestones with sign-offIn use
- Estimates and bill of quantitiesIn use
- Design LockBeing built
-
04
Build
Building from settled decisions
What happens
Procurement, construction, progress reporting and quality control. Changes to scope, cost or time are raised before the work is done.
What you receive & decide
You receive progress reports and approve every variation order before work proceeds. Invoices and receipts can be verified.
BV documents & tools
- Variation orders with client approvalIn use
- QR-verified invoices & receiptsIn use
-
05
Live
Looking at the home once it is lived in
What happens
After handover, we come back to see how the design and construction decisions work in daily life: at T+30, T+180 and T+365.
What you receive & decide
You share what it is like to live in the home. Reviews are done digitally; site visits are selective and depend on the package.
BV documents & tools
- Living ReviewBeing built
-
06
Learn
Bringing the lessons to the next project
What happens
Decisions, changes, construction issues and what residents experience are documented, so experience does not stay locked in one person's memory.
What you receive & decide
Your project benefits from what earlier projects taught us — and helps improve the next one.
BV documents & tools
- Per-project learning notes (internal)In use
- Cross-project learning baseBeing built
Principles
Three things we do not compromise on.
-
01
Settled Before It Is Built
Decisions that are expensive to change on site should be settled on paper. Construction starts from approved decisions, not assumptions.
-
02
A recommendation, not just options
We do not just lay out options A, B and C — we tell you which one we recommend, and why.
-
03
Learning with discipline
We are building a system to learn from every project with discipline, so experience does not stay locked in one person's memory.
Approval points
Inside Design and Build: four phases, each closed by an approval.
-
01
Project Discovery
Project discovery
Brief, site, requirements, lifestyle or operations, budget, time targets and early risk identification.
Phase outputWritten brief and next-stage scope
-
02
Design & Cost Alignment
Design and cost alignment
Concept, layout, visuals, key choices and an initial estimate, adjusted against the budget.
Phase outputApproved concept and initial estimate
-
03
Technical Development
Technical development
Technical drawings, structure-MEP-interior coordination, specifications, bill of quantities, schedule and contract.
Phase outputDesign freeze, bill of quantities, schedule and contract
-
04
Construction & Handover
Construction and handover
Construction, approvals, progress reports, quality control, punch list, handover and maintenance period.
Phase outputHandover certificate and project documents
Project controls
What is controlled, and how.
- Discovery
- Initial data, survey, brief, budget, time targets and project feasibility.
- Design approval
- Concept, development, revisions, design freeze and approval.
- Cost control
- Estimates, bill of quantities, allowances, contingency and value engineering.
- Contract
- Scope, exclusions, schedule, payments and responsibilities.
- Procurement
- Material approvals, vendors, samples, lead times and substitutions.
- Change control
- Variation orders and approval of cost and time impacts.
- Progress control
- Baseline, reports, issue log and coordination meetings.
- Quality control
- Checklists, testing, inspections, mock-ups and punch list.
- Handover
- Handover certificate, documents, manuals, as-built drawings where included, and maintenance period.
Safeguards
Documents you receive and approve.
Confidence in a project does not come from promises. It comes from clear documents and procedures that are actually followed.
-
01
Written contract and scope of work
Scope, exclusions, schedule and payment terms are clear from the start.
-
02
Design brief and approval milestones
Each design stage ends with an approval before moving on.
-
03
Drawings, specifications and bill of quantities
Prepared within scope as the basis for construction and cost.
-
04
Schedule and progress baseline
The reference for measuring progress and delays.
-
05
Material approvals and shop drawings
Samples and production details are approved where relevant.
-
06
Variation procedure
Cost and time impacts are approved before work proceeds.
-
07
Progress reports and issue log
Status, issues and decisions are recorded regularly.
-
08
Quality checklist and punch list
Quality checks at each stage through to final fixes.
-
09
Handover and maintenance period
Handover certificate and maintenance period as per contract.
Risks we control
Client concerns, and the mechanisms that control them.
Design and estimate develop together
Estimates and specification decisions are discussed from the design stage, so the concept never grows without a realistic cost boundary.
Design developed until it can be built
The concept is developed into technical documents and coordinated with structure, MEP, interiors and construction.
Changes must be approved
Every change to scope, cost and time is recorded and discussed before it is carried out.
Progress you can follow
You receive regular documentation of progress, issues, decisions and next steps.
Handover by inspection
Work is inspected, the punch list is completed and handover documents are prepared within scope.
Terms
Terms you will come across.
You do not need to understand every technical drawing. We explain the key decisions, and these terms help you follow each stage.
- RAB
- Rencana Anggaran Biaya: a cost breakdown based on quantities and unit rates.
- BOQ
- Bill of Quantities: the list of work quantities used for pricing.
- Contingency
- A reserve for risks not yet visible, shown openly in the budget.
- Design freeze
- The point at which the design is agreed as final for pricing and construction.
- Variation order
- A change to the work with its cost and time impact, approved before it is carried out.
- Shop drawing
- Production drawings from the builder or supplier, approved before fabrication.
- Punch list
- The list of defects from the final inspection, completed before handover.
- BAST
- Berita Acara Serah Terima: the formal handover certificate.
- PBG
- Persetujuan Bangunan Gedung, the building approval that replaced the IMB under Government Regulation No. 16 of 2021.