Services

Major Home Renovation

For homeowners planning a major change: a full renovation, an added storey or a change of use. Renovation starts with a review of the existing building, because that is where most cost and time risks sit.

Major Home Renovation
Rendered visual

When you need this service

  1. 01

    The house needs a complete rethink: layout, facade and building services.

  2. 02

    You plan to add a storey and need to confirm the existing structure can carry it.

  3. 03

    There are recurring issues such as leaks, cracks or ageing electrical wiring.

  4. 04

    You need to know whether the work can be phased or done while you live there.

Scope

Existing-condition review, transformation design, risk identification and full renovation works.

Included

  • Survey and documentation of existing conditions
  • Initial structural and MEP review of the existing building as needed
  • Architectural and interior transformation design
  • Risk identification, bill of quantities and contingency
  • Work phasing plan, including when the house stays occupied
  • Construction, supervision, progress reporting and handover

What you receive

  • Survey report and photos of existing conditions
  • Design and renovation working drawings
  • Bill of quantities with assumptions and scope limits
  • Schedule and sequence of works
  • Progress reports, change log and punch list
  • Signed handover certificate

Scoped separately

  • Hidden conditions found after demolition are handled as a variation order before any work proceeds.
  • Permitting is defined as a separate scope when required.
  • Moving belongings and temporary housing are outside the scope unless agreed.

Process

Stages and approval points

  1. 01

    Project Discovery

    Survey of existing conditions, requirements, budget and time targets, and early risks such as structure, leaks and services.

    Approval pointAgreed review scope

  2. 02

    Design & Cost Alignment

    Transformation design and initial estimate, including phasing options where budget or timing requires.

    Approval pointApproval of concept and estimate

  3. 03

    Technical Development

    Working drawings, specifications, bill of quantities with contingency, demolition plan, schedule and contract.

    Approval pointDesign freeze, bill of quantities and contract

  4. 04

    Construction & Handover

    Controlled demolition, construction, progress reporting, change control, quality control and handover.

    Approval pointSigned handover certificate

Budget and timing

What shapes the cost

Renovation costs depend heavily on the existing building: structure, roof, electrical and plumbing systems, and moisture. That is why the existing-condition review comes before the final estimate, and contingency is shown openly in the bill of quantities. The sequence and duration of works are planned around how the house is occupied.

Indicative price per m²

  • BasicFrom Mulai dari Rp 4.200.000/m²
  • PremiumFrom Mulai dari Rp 5.500.000/m²
  • LuxuryFrom Mulai dari Rp 8.000.000/m²

These prices are indicative, to help you gauge the scale of your budget. They are not a final offer: final costs are set in a bill of quantities after the survey, design and scope definition.

View indicative pricing

Safeguards

The documents and controls behind every project.

  • Written contract and scope of work
  • Design brief and approval milestones
  • Drawings, specifications and bill of quantities
  • Schedule and progress baseline
  • Material approvals and shop drawings
  • Variation procedure
  • Progress reports and issue log
  • Quality checklist and punch list
  • Handover and maintenance period

Common questions

Questions about this service

All questions
Can we stay in the house during the renovation?

Often yes, with agreed work zones and sequencing. Feasibility is confirmed after the survey, as it depends on the scope and the condition of the house.

What if something is found after demolition?

Findings are recorded and discussed with you. Cost and time impacts are submitted as a variation and approved before any work proceeds.

Can an extra storey be added to an older house?

It can be considered once the existing structure has been assessed. We do not recommend adding a storey without a structural review first.

WhatsApp
Request a Project Review